{"product_id":"hs-manufacturing-systems-statistical-process-control-and-inspection-project-based-learning","title":"Statistical Process Control \u0026 Inspection Project-Based Learning Activity | Manufacturing Systems | Grades 9–12","description":"\u003cp\u003e\u003cstrong\u003eStatistical Process Control \u0026amp; Inspection Project-Based Learning Activity\u003c\/strong\u003e is a project-based learning activity for \u003cstrong\u003eManufacturing Systems\u003c\/strong\u003e (grades 9–12) on \u003cstrong\u003eStatistical Process Control \u0026amp; Inspection\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003ePairs with:\u003c\/strong\u003e \u003ca href=\"\/products\/hs-manufacturing-systems-statistical-process-control-and-inspection-slide-show-presentatio\"\u003eStatistical Process Control \u0026amp; Inspection Slide Show Presentation\u003c\/a\u003e; \u003ca href=\"\/products\/hs-manufacturing-systems-statistical-process-control-and-inspection-guided-notes\"\u003eStatistical Process Control \u0026amp; Inspection Guided Notes\u003c\/a\u003e; \u003ca href=\"\/products\/hs-manufacturing-systems-statistical-process-control-and-inspection-lesson-quiz\"\u003eStatistical Process Control \u0026amp; Inspection Lesson Quiz\u003c\/a\u003e; \u003ca href=\"\/products\/hs-manufacturing-systems-statistical-process-control-and-inspection-vocabulary-words-and-d\"\u003eStatistical Process Control \u0026amp; Inspection Vocabulary Words \u0026amp; Definitions\u003c\/a\u003e.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSections:\u003c\/strong\u003e Manufacturing Systems • Chapter 08; One Project • Six Phases • One Culminating Product; Project Briefing; The Scenario; Driving Question; Your Team's Charge; Project Roadmap; The Finish. \u003cstrong\u003eSample item:\u003c\/strong\u003e “How can the bearing plant prove its bores are measured with the right gauge, centered on target, and in control — before the customer restarts its line?”\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWhat's inside:\u003c\/strong\u003e Project Based Learning Activity (editable .pptx + PDF, 46 slides); answer key \/ model answers for the teacher.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eStandards:\u003c\/strong\u003e Aligned to ITEEA Standards for Technological and Engineering Literacy for Manufacturing Systems, with embedded engineering design practices and career-readiness skills.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eResource type:\u003c\/strong\u003e Project-Based Learning Activity. \u003cstrong\u003eFormat:\u003c\/strong\u003e editable Microsoft PowerPoint file plus a ready-to-print PDF.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eClassroom use:\u003c\/strong\u003e Students work through the project stations over several class periods, ending with a product they present. Built for Manufacturing Systems, grades 9–12.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eFormat note:\u003c\/strong\u003e These files are delivered in Microsoft Office formats (Word and\/or PowerPoint). If you open a worksheet that includes tables in Apple Pages or another non-Microsoft app, table formatting may not display correctly. For best results, use Microsoft Word or PowerPoint (or upload the file to Google Docs). If you run into any formatting issues, contact us and we can send a PDF version.\u003c\/p\u003e","brand":"Waypoint Teaching","offers":[{"title":"Default Title","offer_id":67959517348139,"sku":null,"price":5.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1020\/4836\/6891\/files\/hs-manufacturing-systems-statistical-process-control-and-inspection-project-based-learning-cover-v2.jpg?v=1793446643","url":"https:\/\/waypointteaching.com\/products\/hs-manufacturing-systems-statistical-process-control-and-inspection-project-based-learning","provider":"Waypoint Teaching","version":"1.0","type":"link"}