{"product_id":"hs-manufacturing-systems-complete-course-bundle","title":"Manufacturing Systems Complete Course Bundle","description":"\u003cp\u003eThe \u003cstrong\u003eManufacturing Systems Complete Course Bundle\u003c\/strong\u003e is the entire Waypoint Teaching Manufacturing Systems course (grades 9–12) in one purchase: \u003cstrong\u003e242 resources\u003c\/strong\u003e (484 files) across 4 units, including slide shows, 5E lesson plans, phenomena-based lessons, guided notes, reading and CER worksheets, vocabulary, review games, quizzes, sub plans and more.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eSavings:\u003c\/strong\u003e bought individually these resources total \u003cstrong\u003e$796.50\u003c\/strong\u003e; the complete bundle is \u003cstrong\u003e$175\u003c\/strong\u003e (save $621.50, about 78% off).\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eUnits included\u003c\/strong\u003e (each also sold as its own bundle):\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e\n\u003ca href=\"\/products\/hs-manufacturing-systems-unit-1-evolution-of-manufacturing-and-industrial-organizations-bundle\"\u003eManufacturing Systems Unit 1: Evolution of Manufacturing \u0026amp; Industrial Organizations Bundle\u003c\/a\u003e — 44 resources\u003c\/li\u003e\n\u003cli\u003e\n\u003ca href=\"\/products\/hs-manufacturing-systems-unit-2-materials-science-metals-polymers-ceramics-and-composites-bundle\"\u003eManufacturing Systems Unit 2: Materials Science: Metals, Polymers, Ceramics, \u0026amp; Composites Bundle\u003c\/a\u003e — 44 resources\u003c\/li\u003e\n\u003cli\u003e\n\u003ca href=\"\/products\/hs-manufacturing-systems-unit-3-primary-and-secondary-manufacturing-processes-bundle\"\u003eManufacturing Systems Unit 3: Primary \u0026amp; Secondary Manufacturing Processes Bundle\u003c\/a\u003e — 66 resources\u003c\/li\u003e\n\u003cli\u003e\n\u003ca href=\"\/products\/hs-manufacturing-systems-unit-4-quality-control-lean-systems-and-enterprise-production-bundle\"\u003eManufacturing Systems Unit 4: Quality Control, Lean Systems, \u0026amp; Enterprise Production Bundle\u003c\/a\u003e — 88 resources\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003e\u003cstrong\u003eWhat's included by resource type:\u003c\/strong\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003ePhenomena Lesson: 66\u003c\/li\u003e\n\u003cli\u003eReview Game: 33\u003c\/li\u003e\n\u003cli\u003eVocabulary: 22\u003c\/li\u003e\n\u003cli\u003eSlide Show: 11\u003c\/li\u003e\n\u003cli\u003eGuided Notes: 11\u003c\/li\u003e\n\u003cli\u003eQuiz: 11\u003c\/li\u003e\n\u003cli\u003e5E Lesson Plan: 11\u003c\/li\u003e\n\u003cli\u003eCER Task Cards: 11\u003c\/li\u003e\n\u003cli\u003eChoice Board: 11\u003c\/li\u003e\n\u003cli\u003eSub Plan: 11\u003c\/li\u003e\n\u003cli\u003eDifferentiation Stations: 11\u003c\/li\u003e\n\u003cli\u003ePBL Activity: 11\u003c\/li\u003e\n\u003cli\u003eBell Ringers: 11\u003c\/li\u003e\n\u003cli\u003eScoring Guide: 11\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003e\u003cstrong\u003eDownloads:\u003c\/strong\u003e 11 ZIP files (108 MB total), one per chapter\/section, each under 18 MB.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eFile formats:\u003c\/strong\u003e every resource is included as an editable Microsoft Office file (Word .docx or PowerPoint .pptx) plus a ready-to-print PDF, packaged as ZIP downloads organized into folders by resource type. Unzip on any computer; for best results open the files in Microsoft Word\/PowerPoint or upload them to Google Drive.\u003c\/p\u003e","brand":"Waypoint Teaching","offers":[{"title":"Default Title","offer_id":67959520067883,"sku":null,"price":400.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1020\/4836\/6891\/files\/hs-manufacturing-systems-complete-course-bundle-cover-v2.jpg?v=1793479342","url":"https:\/\/waypointteaching.com\/products\/hs-manufacturing-systems-complete-course-bundle","provider":"Waypoint Teaching","version":"1.0","type":"link"}